Request a quote
What to send us and how fast we reply.
Request a quote →Tooling handled end to end · 5,000 pcs min · 20-minute quotes
Send artworkHow to order
Five steps, the dates attached to each one, and the three things that most often delay a first order.
Vector artwork in AI, PDF or EPS, the finished size in millimetres, the quantity per design, and the date the goods have to be in your hands. If you only have a photo or a sketch, send it and we will tell you what has to be redrawn.
A quote comes back usually inside 20 minutes during Dongguan business hours, with tooling cost, unit price and a delivery date, in US dollars.
We send a digital proof at finished size. Once you approve it and the tooling is paid — RMB 700 for a flat die, RMB 1,200 for a half-relief die — the die is cut in our own tooling shop. This is where most delays are created, so the proof is checked at real size rather than on a screen at 300%.
RMB 200 per design, 7 to 10 days, produced on the production die with the production colour mix. The point is to catch a colour problem before 10,000 pieces are cast rather than after. If your date is tight, production can start without a sample and you accept that colour risk.
The clock runs from artwork approval:
| Quantity per design | Lead time |
|---|---|
| 10,000 pcs | 25 days |
| 50,000 pcs | 35 days |
| 100,000 pcs | 40–50 days |
Peak season before the year-end gifting period adds queue time. Mixed designs in one order run on one schedule, which is why they ship together.
Pieces are counted, colour-checked against the approved sample and packed under one packing list. Freight terms are agreed with the quote, so the landed date is visible before you commit.
AI, PDF or EPS vector artwork, with the finished size in millimetres. A low-resolution image has to be redrawn before a die can be cut, which adds days.
From artwork approval, not from your first email. The die has to be cut and, if you want one, the sample approved before casting starts.
No, but we recommend it. The sample is RMB 200 per design, takes 7 to 10 days and is made on the production die with the production colour mix, so it catches a colour problem before the run rather than after.
Yes. Each design carries its own die fee, and the whole order ships together with one colour reference and one packing list.
What to send us and how fast we reply.
Request a quote →The machines and audits behind every date here.
Production →Minimums, tooling and lead times in one place.
FAQ →Artwork, size, quantity and deadline are all we need. A specialist replies with tooling cost, unit price and a delivery date, usually inside 20 minutes.